
Mobile construction site energy
PORR – A9 motorway construction
Kammern im Liesingtal, Austria · over 25 kWp
PV output
over 25 kWp
Storage
30 kWh
Systems
POWERTOP Basic · POWERCUBE
Units
10× POWERTOP · 2× POWERCUBE
Mobile construction site energy
The project in detail.
The largest mobile array to date: ten POWERTOP Basic on the container complex, plus two POWERCUBE units as storage. The construction site covers its own base load with them. Client: ASFINAG.


