Skip to content
Newsroom

New production line in operation.

Custom module formats rarely fail at the design stage – they fail in manufacturing. With the new line in Wiener Neustadt we produce custom formats in series quality – from the first sample to the batch size for a complete roof, with no detour via external suppliers.

Production line for photovoltaic modules in Wiener Neustadt
Production4 min readdas.kraftwerk

Anyone sourcing custom formats from external suppliers buys not just a module but also their schedule. With our own line in Wiener Neustadt, both are in our hands: the quality and the date.

Why custom formats usually fail in manufacturing

A roof with dormers, skylight strips and angled edges can only be covered with standard modules up to a point. The rest stays empty – not because it is technically impossible, but because no one wants to manufacture the right module in the required quantity. Small batch sizes are a disruption for large module factories.

The result is planning that follows the available module instead of the building. On existing buildings with irregular geometry, this costs noticeable area and therefore yield.

The module should follow the roof – not the roof the module.

What the new line delivers

  • Custom module formats from batch size one, in the same process quality as the series
  • A short path from sample to approval – sampling and series run on the same line
  • Colour and surface variants for architecturally sensitive facades and roofs
  • End-to-end batch documentation for every module as the basis of the warranty
  • Reliable delivery dates without depending on external production slots

Manufacturing as part of planning

The real gain is not capacity but feedback. When planning and manufacturing sit in the same house, the question of whether a format can be produced economically is answered in the design phase – not only during procurement. Changes to grid, edge or connection can be checked while they still cost nothing.

Production takes place in Wiener Neustadt. That is not local nostalgia but a question of distances: short coordination loops, short transport routes and the option, when in doubt, of standing at the machine together.

Share this post